Sheet 00 · Estimating and job costMESA RIDGE CTB · Isometric · NTS

Every job.From ditchto first flow.

Bid a job at your own rates and margin. When you win it, the bid becomes the job’s budget, and every crew day and cost line reports against it by cost code.

Isometric drawing of a central tank battery laid out as an L on a 400 foot pad: six flowlines into six three-phase separators, heater treaters and a gas separator along the pipe rack, oil and water tanks in containment down the other leg, and the flare line run out to the far cornerIsometric drawing of a central tank battery laid out as an L on a 400 foot pad: six flowlines into six three-phase separators, heater treaters and a gas separator along the pipe rack, oil and water tanks in containment down the other leg, and the flare line run out to the far corner
ProjectMESA RIDGE CTB
TitleEstimating and job cost
Sheet00
ScaleNTS
RevA
Agger. Bid, build, bill.Agger. Bid, build, bill.Agger. Bid, build, bill.Agger. Bid, build, bill.

Built in the order it’s bid

Sheet 01 · Pipeline spread

A gathering line goes in the way a spread builds it, one crew behind the next. Each step is a line on the bid, with its cost code, its quantity and the crew that does it. Watch the section build, or press any step.

Typical section · 12" gathering · STA 112+00Step 9 of 9
09RestoreDozer, seeder · marker posts
Isometric drawing of a pipeline right-of-way at the step shown, from the bare ground to the line buried and the ground restored
Typical section · across the 75' right-of-way
50'-0" PERMANENT EASEMENT25'-0" TEMP. WORKSPACESPOIL SIDEWORKING SIDE · TRAVEL LANEROW STAKECROWNED TO SETTLETOPSOILSPOILWARNING TAPENATIVE BACKFILL12" SAND PADDING OVER6" BEDDING UNDER48" COVER36" MIN36" DITCH12.75" OD · MILL FBECL PIPELINE MARKERRESEEDEDDOZERTRACKHOEPIPE TRUCK · 40' JOINTSWELD SHACKWELD RIG · X-RAYFIELD JOINT · HOLIDAY TESTSIDE-BOOMS × 3IN LINE, CRADLING THE STRINGPADDING MACHINETEST HEADPRESSURE HELDFILL PUMPTYPICAL SECTION · 12" GATHERING · STA 112+00 · NOT TO SCALE
The spread · MESA RIDGE gathering · STA 0+00 to 224+00Day 23 of 41
0+0020+0040+0060+0080+00100+00120+00140+00160+00180+00200+00220+0001 CLEAR & GRADE100%COMPLETE02 DITCH92%+1,840 LF TODAY03 STRING & BEND86%+50 JTS TODAY04 WELD & X-RAY74%+38 WELDS TODAY05 COAT JOINTS70%+41 JTS TODAY06 LOWER IN58%+1,200 LF TODAY07 PAD & BACKFILL50%+1,100 LF TODAY08 HYDROTEST0%NOT STARTED09 RESTORE18%+600 LF TODAYEACH BAR IS THAT CREW'S FOOTAGE BY STATION · THE RED END IS TODAY'S

Every vessel is a line item

Sheet 02 · Production facility

A battery on a 400' pad, piped the way one is run. Point at a vessel and its bid line lights up. Flip the switches to watch the gas find its way to flare.

Central tank battery · Process plan400' × 400' pad
Normal operation: gas sold, water to SWD, oil through the LACT.
400'400'PIPE RACKFROM WELLS1H2H3H4H5H6H3-PHASE SEPS6 · 6'×15'GAS SEPMETERFLARE SEPHEATER TREATERS · 2HP FLAREOIL TANKS4 × 400 BBLWATER TANKS4 × 400 BBLVRULACTP-1 · P-2GAS SALES · STEELOIL SALESSTEELPOLY WATER LINETO 3RD-PARTY SWDCENTRAL TANK BATTERY · PROCESS PLAN · NOT TO SCALE
ItemSetQty
700-01Flowlines from 6 wells to their separators6 EA
710-02Set 3-phase separators, horizontal 6' × 15'6 EA
710-08Set 2-phase gas separator, vertical1 EA
730-01Gas sales meter run1 EA
710-05Set heater treaters, vertical 8' × 20'2 EA
710-09Set flare separator, vertical1 EA
750-01High-pressure flare and flare line to the pad corner1 EA
720-04Set and level 400 BBL oil tanks4 EA
720-05Set and level 400 BBL water tanks4 EA
740-01Set VRU skid, pipe and wire1 EA
760-01Set pipeline LACT unit1 EA
770-02Centrifugal water transfer pumps on manifold2 EA
800-01Gas sales line, steel2,640 LF
800-02Oil sales line, steel2,640 LF
800-03Poly water line to 3rd-party SWD5,280 LF

The number you bid is the number you track

Sheet 03 · Bid to cost

A line waiting on a quote is marked until the quote lands. Once the job starts, each line shows what it has cost against what it was bid.

ItemDescriptionStateBidTo dateUsed
100-01Clear and grade right-of-wayWorking$118,400$121,900
310-12String, weld and coat 12 in. line pipeWorking$684,500$402,300
520-02Bore under county road, 16 in. casingWorking$46,800$38,200
720-04Set and level 400 BBL tanksWorking$92,600$41,700
Bid$942,300
Cost to date$604,100
Left in the bid$338,200
MESA RIDGE gathering · bid out

Pricing by appointment

Sheet 04 · Transmittal
What you run

Pipeline, facilities, pads and roads: tell us the work you bid and we will bring a job like yours, priced the way you price it.

Already on Agger

Your company’s estimates and jobs are at agger.app.